Work In Progress Update!

13009832_1293795507300463_717781601_o

Finally got the ignition switch, tank lock, and seat lock set in, and installed everything today. Its nice to have a working set of locks again. I also painted the upper triple-tree clamp while it was off the bike because why not? I want to paint the entire frame in that color, but that comes much later.

The dreaded wiring work comes next. My friend and I will be stripping, soldering, heat-shrinking, and wrapping everything to neatening everything up to ensure proper operation. Once that has been accomplished, the bike will be tested to ensure it finally runs!

Brakes are also on the list, as I like stopping and being alive.

More updates later!